The design solution consists of a series of elements, main or accessory, necessary for the realisation of the link and its insertion in the area road system, for a total length of 1015m, covering an area of approximately 40,000sqm. The design solution consists of two main elements: Branch S1 and Branch S2.

The «Viadotto Chiusa», constructed around 1976 for the realization of the variant to the SS18 “Tirrena Inferiore,” has been affected by a slow landslide event that involved two intermediate piers, resulting in structural damage. Based on the needs and critical issues, the project for the partial reconstruction, repair, and consolidation of the “Viadotto Chiusa” was defined in its entirety.

The project involves the construction of a road link between the SS 264 and the SP Galatina near the existing bridge over the Volturno River, in the municipalities of Pontelatone and Capua (CE), approximately 550 meters upstream from the Ponte Annibale crossing road. The need for a new connection arose from the urgency to resolve traffic flow issues in this highly trafficked node, with the goal of diverting much of the related traffic; an important aspect is also the idea of a new tube bridge for both road traffic and the agricultural water pipeline.

The intervention concerns the structural design and implementation of the line products related to the WORKS OF COMPLETION LINE 10 of the Suburban and Metro Lines. In particular, the line products concern the ventilation system, identified by the acronym SH16 and SH18, consisting of the underground electrical cabin, the well and the connecting chamber between the open surface and the line tunnel; The emergency exit and rescue access system, identified as UE/AS T SH17 and SH25, consisting of two vertical wells and two underground tunnels connecting the open surface to the two platforms on the sides of the line tunnel. Along the route of the line tunnel in the Afragola depot section, it is planned to build two ventilation chambers equipped with reversible type ventilation groups designed to ensure proper ventilation and suitable environmental conditions in the presence of the public of the entire system of tunnels and stations during operation, but also have the function of evacuating fumes in case of fire to ensure maximum safety for users in case of emergency.

The Grand Project ‘Environmental restoration and enhancement of the Campi Flegrei lakes’ aims to restore and recover the tourist-recreational vocation of Lakes Averno, Lucrino, Miseno and Fusaro, with the consequent revitalisation of the area’s tourist and bathing system. The Phlegraean Lakes, water basins of great naturalistic importance and high environmental and landscape value, have in fact undergone a continuous and constant process of degradation of the water quality and ecosystem over the last few decades, which has severely limited their usability. The extension of the network to the urbanised areas has resulted in the decommissioning of the remaining existing domestic sewage accumulation plants, achieving in the short term the objective of de-pollution of lake and sea water.

The intervention, as already described in the ‘general report’, envisages the construction of the Flywheel body aimed at integrating the present hospital services and at significantly adapting the capacity of inpatient and outpatient facilities for the ‘Umberto I’ Hospital Centre. In this paragraph, the contents of the project intervention will be explained. The objective of the project is therefore the expansion of an area for the Hospital, therefore, with reference to the functions to be realised, the following activities will take place: Inpatient area; General services and logistics; Toilets; Waiting and distribution area; Specific outpatient clinics. The activities listed above will occupy the Volano body temporarily, during the period of the hospital’s restructuring, after which these activities will be redistributed within the hospital complex. The new building will be used for administrative purposes.

The Ripalta-Lesina railway track-doubling project stretches 7,983 metres in the province of Foggia, affecting the municipalities of Serracapriola and Lesina. The latter represents a critical point for the Adriatic Route, influencing the management of railway traffic and limiting the fluidity of circulation due to crossroads and priorities. The works begin at km 464+268 of the existing line and end at km 472+371, providing for the widening of the railway seat on the upstream side, the construction of a double-track variant and the expansion of the line on the sea side between km 5+200 and km 7+470. The main work is the Ripalta viaduct, 1,175 metres long, between km 2+565 and km 3+740. The project also includes the decommissioning of the Ripalta electrical substation, currently out of service, and the construction of a new medium-voltage ESS near the station, improving the efficiency of the infrastructure. To ensure adequate drainage and prevent hydraulic interference, several mitigation works are planned.

The seismic adjustment of the Santobono Pavilion, located at the P.O. Santobono of the A.O.R.N. Santobono-Pausillipon in Naples, is part of the investment axis M6.C2 1.2. The project involves structural reinforcement with targeted interventions and the construction of three strategically positioned dissipative towers to optimize the building’s response to earthquakes. These towers, equipped with devices at the base, reduce seismic stress by ensuring the safety of the structure without interrupting hospital activities. In addition, due to interference with existing terraces, a reorganization of adjacent outdoor areas is planned. To reduce the visual impact, the towers will be shielded with a metal substructure and panels made of stretched aluminium mesh. The decorative element of a giraffe, designed to harmonize with the pediatric environment, also gives the intervention an aesthetic value.

The biogas plant of Codroipo, located in Pannellia, is part of a site already authorised by the Province of Udine and accessible through the existing road network, with no changes to the current entrances. The project involves a variant to the existing infrastructure with the integration of a dry anaerobic process section of the organic fraction, aimed at generating biogas for transformation into electrical and thermal energy.

The plant will be built in the Municipality of Trinitapoli in the ‘San Lorenzo’ locality, located within the area delimited by the SS544 Foggia-Trinitapoli State Roads, the SS16 and the SP 77, which can be travelled after taking the Cerignola Ovest or Foggia exit on the e55 motorway. The project envisages the construction of the new composting plant for the production of mixed composted soil improver for agricultural use.